World Contractors begin work on Kotoka International Airport Terminal 3 to fix flooding – Pulse Nigeria

The Minister of Aviation, Kofi Ada has said that contractors have started work on parts of the apron and tarmac of Terminal 3 of the Kotoka International Airport to fix a faulty drainage system.

This was after parts of the tarmac and the arrival areas of …

airport.JPG

Read more via Pulse Nigeria – Nigeria – https://ift.tt/2LBlseX

Get more World News
 
Last edited by a moderator:
Back
Top