curator

Administrator
The $3.3 billion Floating Production Storage Offloading (FPSO) unit built by Samsung Heavy Industries of Korea (SHI) for the 200,000 barrels per day capacity Egina oilfield began to sail to the oilfield Sunday.

The FPSO departed LADOL Free Zone in Lagos to the offshore field, …

Oil-Rig.jpg

Read more via Premium Times Nigeria – https://ift.tt/2Mzs7r6

Get more: Nigeria Business News
 
Last edited by a moderator:
Back
Top