Metro Fashola: 3 Major Improvements in Nigeria's Power Supply Since 2015

L

LequteMan

Guest
Minister of Power, Babatunde Fashola, at the 23rd monthly power sector operators meeting in Nasarawa on Monday listed 3 milestones achieved by the sector since 2015.

According to him,

a. Generated power has gone up to 7000 MW in 2017 from 3,000 MW in May 2015

b. Transmission Capacity at 6900MW in 2017 from about 5,000 MW in May 2015

c. Peak Distribution now averaging 5,000 MW in 2017 from 2,690MW in 2015.
 

Attachments

  • fashola4.jpg
    fashola4.jpg
    7.3 KB · Views: 9
Back
Top